A Poole council spokesman said one of the steel ‘totems’ on the Hamworthy side has come loose but engineers are on site re-securing the totem. One lane has been temporarily closed to traffic while these works are carried out as a crane from MB Crane Hire is being used to support the totem.
The four 7-metre high curved stainless steel totems house the safety barriers, warning lights and operating systems for the Twin Sails Bridge. Road users are being directed over Poole Bridge by electronic message signs in the area.